M00050127
New product
ASME BPVC-IIB-2007 2007 ASME Boiler and Pressure Vessel Code, Section II: Materials - Part B: Nonferrous Material Specifications, Includes Addenda (2008 and 2009)
standard by ASME International, 07/01/2007
Includes all addenda, interpretations, and updates until 2010. Product Details
Published: 07/01/2007 ISBN(s): 0791830500 Part of: ASME BPVC-II-2007 SET Customary, ASME BPVC-II-2007 SET Metric
In stock
Warning: Last items in stock!
Availability date: 01/04/2022
AN INTERNA TIONAL C ODE
2007 ASME Boiler & Pressure Vessel Code
2008a Addenda July 1, 2008
AN INTERNA TIONAL C ODE
2007 ASME Boiler & Pressure Vessel Code
2008a Addenda July 1, 2008
II
Part B
Nonferrous Material Specifications
MATERIALS
ASME Boiler and Pressure Vessel Committee
Subcommittee on Materials
Date of Issuance: July 1, 2008
This international code or standard was developed under procedures accredited as meeting the criteria for American National Standards and it is an American National Standard. The Standards Committee that approved the code or standard was balanced to assure that individuals from competent and concerned interests have had an opportunity to participate. The proposed code or standard was made available for public review and comment that provides an opportunity for additional public input from industry, academia, regulatory agencies, and the public-at-large.
ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.
ASME does not take any position with respect to the validity of any patent rights asserted in connection with any items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard are expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is entirely their own responsibility.
Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as government or industry endorsement of this code or standard.
ASME accepts responsibility for only those interpretations of this document issued in accordance with the established ASME procedures and policies, which precludes the issuance of interpretations by individuals.
The footnotes in this document are part of this American National Standard.
The Specifications published and copyrighted by the American Society for Testing and Materials are reproduced with the Society’s permission.
No part of this document may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior written permission of the publisher.
Library of Congress Catalog Card Number: 56-3934 Printed in the United States of America
The American Society of Mechanical Engineers Three Park Avenue, New York, NY 10016-5990
Copyright © 2008 by
THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS
All rights reserved
I Rules for Construction of Power Boilers II Materials
Part A — Ferrous Material Specifications Part B — Nonferrous Material Specifications
Part C — Specifications for Welding Rods, Electrodes, and Filler Metals Part D — Properties (Customary)
Part D — Properties (Metric)
Rules for Construction of Nuclear Facility Components
Subsection NCA — General Requirements for Division 1 and Division 2 Division 1
Subsection NB — Class 1 Components Subsection NC — Class 2 Components Subsection ND — Class 3 Components Subsection NE — Class MC Components Subsection NF — Supports
Subsection NG — Core Support Structures
Subsection NH — Class 1 Components in Elevated Temperature Service Appendices
Division 2 — Code for Concrete Containments
Division 3 — Containments for Transportation and Storage of Spent Nuclear Fuel and High Level Radioactive Material and Waste
Rules for Construction of Heating Boilers V Nondestructive Examination
VI Recommended Rules for the Care and Operation of Heating Boilers VII Recommended Guidelines for the Care of Power Boilers
VIII Rules for Construction of Pressure Vessels Division 1
Division 2 — Alternative Rules
Division 3 — Alternative Rules for Construction of High Pressure Vessels IX Welding and Brazing Qualifications
Fiber-Reinforced Plastic Pressure Vessels
Rules for Inservice Inspection of Nuclear Power Plant Components XII Rules for Construction and Continued Service of Transport Tanks
iii
Colored-sheet Addenda, which include additions and revisions to individual Sections of the Code, are published annually and will be sent automatically to purchasers of the applicable Sections up to the publication of the 2010 Code. The 2007 Code is available only in the loose-leaf format; accordingly, the Addenda will be issued in the loose-leaf, replacement-page format.
ASME issues written replies to inquiries concerning interpretation of technical aspects of the Code. The Inter- pretations for each individual Section will be published separately and will be included as part of the update service to that Section. Interpretations of Section III, Divisions 1 and 2, will be included with the update service to Subsec- tion NCA.
Interpretations of the Code are distributed annually in July with the issuance of the edition and subse- quent addenda. Interpretations posted in January at www.cstools.asme.org/interpretations are included in the July distribution.
The Boiler and Pressure Vessel Committee meets regu- larly to consider proposed additions and revisions to the Code and to formulate Cases to clarify the intent of existing requirements or provide, when the need is urgent, rules for materials or constructions not covered by existing Code rules. Those Cases that have been adopted will appear in the appropriate 2007 Code Cases book: “Boilers and Pressure Vessels” and “Nuclear Components.” Supple- ments will be sent automatically to the purchasers of the Code Cases books up to the publication of the 2010 Code.
iv
SUMMARY OF CHANGES
Addenda to the 2007 Edition of the Code are issued in the form of replacement pages. Revisions, additions, or deletions are incorporated directly into the affected pages. It is advisable, however, that all replaced pages be retained for reference.
Replace or insert the pages listed. Changes given below are identified on the pages by a margin note, A08, placed next to the affected area. Revisions to the 2007 Edition are indicated by 07. For the listing below, the Page references the affected area. A margin note, A08, placed next to the heading indicates Location. Revisions are listed under Change.
The Record Numbers listed below are explained in more detail in “List of Changes in Record Number Order” following the Summary of Changes.
Page Location Change (Record Number)
xv–xxv Roster Updated to reflect 2008 Addenda
xxvii Personnel Updated to reflect 2008 Addenda xxxi–xxxv Specifications Listed Updated to reflect 2008 Addenda
by Materials
xlv–lii Guideline on Updated to reflect 2008 Addenda Acceptable ASTM
Editions
19–26.1 | SB-42 | Revised in its entirety (07-1548) |
27–34 | SB-43 | Revised in its entirety (07-1379) |
36 | SB-61 | Errata to correct outside running head (07-1269) |
93–104 | SB-127 | Revised in its entirety (07-1380) |
105–108.2 | SB-135 | Revised in its entirety (07-1381) |
137–144 | SB-160 | Revised in its entirety (07-1549) |
175–186.1 | SB-164 | Revised in its entirety (07-1545) |
203–208 | SB-167 | Revised in its entirety (07-1309) |
209–222 | SB-168 | Revised in its entirety (07-1311) |
237–246.1 | SB-187/SB-187M | Revised in its entirety (07-1382) |
389–397 | SB-251 | Revised in its entirety (07-1384) |
399–412 | SB-265 | Revised in its entirety (07-406) |
413–416.3 | SB-271 | Revised in its entirety (07-1385) |
495–502.2 | SB-366 | Errata to add ASTM revision 06b in its entirety (07-1264) |
613–618.1 | SB-446 | Revised in its entirety (07-1546) |
703–710 | SB-511 | Revised in its entirety (07-1550) |
723–727 | SB-523/SB-523M | Revised in its entirety (07-1586) |
769–780.1 | SB-551/SB-551M | Revised in its entirety (07-1587) |
915–919 | SB-658/SB-658M | Revised in its entirety (07-1588) |
969–975 | SB-691 | Revised in its entirety (07-1589) |
Copyright c 2008 by the American
(c)
Society
of Mechanical Engineers.
Page | Location | Change (Record Number) |
1116.1–1116.12 | SF-468 | Added (07-324) |
1116.13–1116.23 | SF-468M | Added (07-324) |
1119 | Nonmandatory Appendix A | Revised (05-533) |
c
(d)
Copyright 2008 by the American Society of Mechanical Engineers.
LIST OF CHANGES IN RECORD NUMBER ORDER
Record Number Change
05-533 Updated Nonmandatory Appendix A.
07-324 New specifications added. Identical with ASTM F 468-06 and ASTM F 468M-06 except that certification has been made mandatory.
07-406 ASME SB-265 updated to later 2006b version of ASTM B 265 for all grades except for section 15.1 which requires mandatory certification.
07-1264 Errata to include ASTM B 366-04b.
07-1269 Errata to correct Specification Designation Header for SB-61. 07-1309 ASME SB-167 updated to later 2006 version of ASTM B 167. 07-1311 ASME SB-168 updated to later 2006 version of ASTM B 168.
07-1379 ASME SB-43 updated to later 1998 (Reapproved 2004) version of ASTM B 43. 07-1380 ASME SB-127 updated to later 2005 version of ASTM B 127.
07-1381 ASME SB-135 updated to later 2002 version of ASTM B 135.
07-1382 ASME SB-187/SB-187M updated to later 2006 version of ASTM B 187/B 187M. 07-1384 ASME SB-251 updated to later 2002E1 version of ASTM B 251.
07-1385 ASME SB-271 updated to later 2006 version of ASTM B 271. 07-1545 ASME SB-164 updated to later 2003 version of ASTM B 164. 07-1546 ASME SB-446 updated to later 2003 version of ASTM B 446. 07-1548 ASME SB-42 updated to later 2002E1 version of ASTM B 42. 07-1549 ASME SB-160 updated to later 2005 version of ASTM B 160.
07-1550 ASME SB-511 updated to later 2001 (Reapproved 2005) version of ASTM B 511. 07-1586 ASME SB-523/SB-523M updated to later 2007 version of ASTM B 523/B 523M. 07-1587 ASME SB-551/SB-551M updated to later 2007 version of ASTM B 551/B 551M. 07-1588 ASME SB-658/SB-658M updated to later 2006 version of ASTM B 658/B 658M. 07-1589 ASME SB-691 updated to later 2002 (Reapproved 2007) version of ASTM B 691.
Copyright c 2008 by the American
(e)
Society
of Mechanical Engineers.
INTENTIONALLY LEFT BLANK
Copyright c 2008 by the American Society of Mechanical Engineers.
Foreword ............................................................................... xi
Statements of Policy .................................................................... xiii
Personnel .............................................................................. xv
ASTM Personnel xxvii
Preface xxix
Specifications Listed by Materials xxxi
Specification Removal xxxvii
Guidelines on Submittal of Technical Inquiries to the Boiler and Pressure Vessel
Committee xxxix
Guideline on the Approval of New Materials Under the ASME Boiler and Pressure
Vessel Code .......................................................................... xli
Guideline on Acceptable ASTM Editions .................................................. xlv
Guideline on Acceptable Non-ASTM Editions ............................................. liii
Guidelines on Multiple Marking of Materials .............................................. lv Summary of Changes .................................................................... lvii
List of Changes in BC Order ............................................................. lix
SB-26/SB-26M Aluminum-Alloy Sand Castings 1
SB-42 Seamless Copper Pipe, Standard Sizes 19
SB-43 Seamless Red Brass Pipe, Standard Sizes 27
SB-61 Steam or Valve Bronze Castings 35
SB-62 Composition Bronze or Ounce Metal Castings 37
SB-75 Seamless Copper Tube 39
SB-96/SB-96M Copper-Silicon Alloy Plate, Sheet, Strip, and Rolled Bar for General
Purposes and Pressure Vessels 49
SB-98/SB-98M Copper-Silicon Alloy Rod, Bar, and Shapes 55
SB-108 Aluminum-Alloy Permanent Mold Castings 63
SB-111/SB-111M Copper and Copper-Alloy Seamless Condenser Tubes and Ferrule
Stock 79
SB-127 Nickel-Copper Alloy (UNS N04400) Plate, Sheet, and Strip 93
SB-135 Seamless Brass Tube 105
SB-148 Aluminum-Bronze Sand Castings 109
SB-150/SB-150M Aluminum Bronze Rod, Bar, and Shapes 115
SB-151 Copper-Nickel-Zinc Alloy (Nickel Silver) and Copper-Nickel Rod
and Bar 123
SB-152 Copper Sheet, Strip, Plate, and Rolled Bar 129
SB-160 Nickel Rod and Bar 137
SB-161 Nickel Seamless Pipe and Tube 145
SB-162 Nickel Plate, Sheet, and Strip 151
SB-163 Seamless Nickel and Nickel Alloy Condenser and Heat-Exchanger
Tubes 165
SB-164 Nickel-Copper Alloy Rod, Bar, and Wire 175
SB-165 Nickel-Copper Alloy (UNS N04400) Seamless Pipe and Tube 187
v
SB-166 | Nickel-Chromium-Iron Alloys (UNS N06600, N06601, N06603, N06690, N06693, N06025, and N06045) and Nickel-Chromium-Cobalt- Molybdenum Alloy (UNS N06617) Rod, Bar, and Wire .............. | 193 |
SB-167 | Nickel-Chromium-Iron Alloys (UNS N06600, N06601, N06603, N06690, N06693, N06025, and N06045) and Nickel-Chromium-Cobalt- Molybdenum Alloy (UNS N06617) Seamless Pipe and Tube.......... | 203 |
SB-168 | Nickel-Chromium-Iron Alloys (UNS N06600, N06601, N06603, N06690, N06693, N06025, and N06045) and Nickel-Chromium-Cobalt- Molybdenum Alloy (UNS N06617) Plate, Sheet, and Strip............ | 209 |
SB-169 SB-171/SB-171M SB-187/SB-187M | Aluminum Bronze Plate, Sheet, Strip, and Rolled Bar .................. Copper-Alloy Plate and Sheet for Pressure Vessels, Condensers, and Heat Exchangers.................................................. Copper Bar, Bus Bar, Rod, and Shapes and General Purpose Rod, Bar, and Shapes....................................................... | 223 229 237 |
SB-209 | Aluminum and Aluminum-Alloy Sheet and Plate....................... | 247 |
SB-210 | Aluminum and Aluminum-Alloy Drawn Seamless Tubes................ | 285 |
SB-211 | Aluminum and Aluminum-Alloy Bar, Rod, and Wire ................... | 297 |
SB-221 SB-234 SB-241/SB-241M | Aluminum and Aluminum-Alloy Extruded Bars, Rods, and Profiles ...... Aluminum and Aluminum-Alloy Drawn Seamless Tubes for Condensers and Heat Exchangers.............................................. Aluminum and Aluminum-Alloy Seamless Pipe and Seamless Extruded Tube ............................................................ | 309 317 325 |
SB-247 SB-248 SB-249/SB-249M SB-251 | Aluminum-Alloy Die and Hand Forgings.............................. General Requirements for Wrought Copper and Copper-Alloy Plate, Sheet, Strip, and Rolled Bar ....................................... General Requirements for Wrought Copper and Copper-Alloy Rod, Bar, Shapes, and Forgings ......................................... General Requirements for Wrought Seamless Copper and Copper-Alloy Tube ............................................................ | 347 355 371 389 |
SB-265 | Titanium and Titanium Alloy Strip, Sheet, and Plate ................... | 399 |
SB-271 | Copper-Base Alloy Centrifugal Castings............................... | 413 |
SB-283 | Copper and Copper-Alloy Die Forgings (Hot-Pressed) .................. | 417 |
SB-308/SB-308M | Aluminum-Alloy 6061-T6 Standard Structural Profiles.................. | 427 |
SB-315 | Seamless Copper Alloy Pipe and Tube ................................ | 433 |
SB-333 | Nickel-Molybdenum Alloy Plate, Sheet, and Strip ...................... | 447 |
SB-335 | Nickel-Molybdenum Alloy Rod ...................................... | 455 |
SB-338 |
|