New Reduced price! ASME NM.1-2020 View larger

ASME NM.1-2020

M00050652

New product

ASME NM.1-2020 Thermoplastic Piping Systems

standard by ASME International, 12/31/2020

Full Description

ASME NM.1 provides requirements for the design, materials, manufacturing, fabrication, installation, inspection, examination and testing of thermoplastic pressure piping systems. The standard addresses both pipe and piping components that are produced as standard products and custom products that are designed for a specific application.

More details

In stock

$114.40

-56%

$260.00

More info

Thermoplastic Piping Systems


Thermoplastic Piping Systems


ASME Standards for Nonmetallic Pressure Piping Systems


AN A MERICAN NA TIONAL S T AND ARD



ASME NM.1-2020

(Revision of ASME NM.1-2018)

ASME NM.1-2020

(Revision of ASME NM.1-2018)


Thermoplastic

Piping Systems


ASME Standards for Nonmetallic Pressure Piping Systems


AN AMERICAN NATIONAL STANDARD



Two Park Avenue • New York, NY • 10016 USA

Date of Issuance: December 31, 2020


The next edition of this Standard is scheduled for publication in 2022. This Standard will become effective 6 months after the Date of Issuance.


ASME issues written replies to inquiries concerning interpretations of technical aspects of this Standard. Periodically certain actions of the ASME NPPS Committee may be published as Cases. Cases and interpretations are published on the ASME website under the Committee Pages at https://cstools.asme.org/ as they are issued.


Errata to codes and standards may be posted on the ASME website under the Committee Pages to provide corrections to incorrectly published items, or to correct typographical or grammatical errors in codes and standards. Such errata shall be used on the date posted.


The Committee Pages can be found at https://cstools.asme.org/. There is an option available to automatically receive an e-mail notification when errata are posted to a particular code or standard. This option can be found on the appropriate Committee Page after selecting “Errata” in the “Publication Information” section.


ASME is the registered trademark of The American Society of Mechanical Engineers.


This code or standard was developed under procedures accredited as meeting the criteria for American National Standards. The Standards Committee that approved the code or standard was balanced to assure that individuals from competent and concerned interests have had an opportunity to participate. The proposed code or standard was made available for public review and comment that provides an opportunity for additional public input from industry, academia, regulatory agencies, and the public-at-large.

ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.

ASME does not take any position with respect to the validity of any patent rights asserted in connection with any items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard are expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is entirely their own responsibility.

Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as government or industry endorsement of this code or standard.

ASME accepts responsibility for only those interpretations of this document issued in accordance with the established ASME procedures and policies, which precludes the issuance of interpretations by individuals.


No part of this document may be reproduced in any form, in an electronic retrieval system or otherwise,

without the prior written permission of the publisher.


The American Society of Mechanical Engineers Two Park Avenue, New York, NY 10016-5990


Copyright © 2020 by

THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS

All rights reserved Printed in U.S.A.


CONTENTS

Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

Committee Roster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii

Correspondence With the NPPS Committee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiii

Summary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xvi


Chapter 1

Scope and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1

1-1

Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1

1-2

General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1

1-3

Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2

1-4

Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7

1-5

Status of Appendices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7

Chapter 2

Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10

2-1

Design Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10

2-2

Design Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11

2-3

Pressure Design of Piping Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

14

2-4

Other Design Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

21

Chapter 3

Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

23

3-1

General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

23

3-2

Materials and Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

23

3-3

Thermoplastic Composite Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

24

Chapter 4

Standards for Piping Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

25

4-1

General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

25

4-2

Reference Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

25

Chapter 5

Fabrication, Assembly, and Erection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

33

5-1

General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

33

5-2

Thermoplastic Fusing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

41

5-3

Thermoplastic Solvent Fusion Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

61

Chapter 6

Inspection, Examination, and Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

68

6-1

Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

68

6-2

Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

68

6-3

Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

71

Chapter 7

Use of Metallic Piping Lined With Thermoplastics . . . . . . . . . . . . . . . . . . . . . . . . .

74

7-1

General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

74

7-2

Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

74

7-3

Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

74

7-4

Design Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

74

7-5

Fabrication and Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

82

7-6

Storage and Handling Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

84

7-7 Inspection, Examination, and Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84

Chapter 8 Multilayered Reinforced Thermoplastic Piping Systems . . . . . . . . . . . . . . . . . . . . . 90

8-1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

8-2 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

8-3 Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

8-4 Fabrication, Assembly, and Erection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92

8-5 Examination, Inspection, and Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94

Mandatory Appendices

I Fusing and Electrofusing of Polyamide-11 Thermoplastic Piping; and Fusing of Polypropylene, Poly(Vinylidene Fluoride), and Poly(Tetrafluoroethylene) Plastic Liners

of Lined Steel Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96

II Threaded Thermoplastic Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113

  1. Acceptance Criteria for Thermoplastic Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117

  2. Stress Intensification Factors and Flexibility Factors . . . . . . . . . . . . . . . . . . . . . . . . . . 118

    V One-Piece Thermoplastic Flanges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123

    Nonmandatory Appendices


    A

    Components for Thermoplastic Lap-Joint Flange Connections . . . . . . . . . . . . . . . . . . . .

    127

    B

    Design Requirements for Buried Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    149

    C

    Pressure Surge From Fluid Transient . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    158

    D

    Multilayered Reinforced Thermoplastic Piping System(s) Operation, Maintenance, and Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


    160


    Figures

    2-3.2.2-1

    Nomenclature for 90-deg Mitered Elbows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    16

    2-3.2.4-1

    Tapered Transition Joint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    18

    5-1.11-1

    Fusion Positions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    39

    5-1.11-2

    Fusion Test Positions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    40

    5-2.6-1

    Heat Fusion Joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    43

    5-2.6.1-1

    Required Minimum Melt Bead Size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    44

    5-2.8.1.1-1

    Cross Section of Upset Beads for Butt-Fused Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    47

    5-2.8.1.1-2

    Cross Section of Upset Beads for Sidewall-Fused Fitting (Profile at Crotch of Fitting) . .

    48

    5-2.8.1.3-1

    Bend Test Specimen Removal, Configurations, and Testing . . . . . . . . . . . . . . . . . . . . . .

    51

    5-2.8.1.3-2

    Electrofusion Bend Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    53

    5-2.8.1.4-1

    HSTIT Specimen Configuration and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    54

    5-2.8.1.4-2

    HSTIT Specimen Failure Examples . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    55

    5-2.8.1.4-3

    Electrofusion Peel Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    56

    5-2.8.1.4-4

    Short-Term Hydrostatic Test Specimen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    57

    5-3.5-1

    Solvent Fusion Joint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    63

    5-3.6.2-1

    Solvent Fusion Specimens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    66

    7-4.4.4.4-1

    Stress Range Factor, f . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    78

    I-7.7-1

    Instruction on Preparing and Cutting Electrofusion Coupling for Crush Test . . . . . . . . .

    99

    I-7.8-1

    Joint Crush Specimens in Vise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    100

    I-8.2-1

    Polyethylene Pipe Butt-Fusion Joint O.D. Bead (Cross-Sectional View) . . . . . . . . . . . . . .

    103

    I-9.1-1

    Cross-Sectional View of PA-11 Butt-Fusion Bead . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    104


    I-9.2-1

    Cross-Sectional View of an Electrofusion Coupling . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    105

    I-9.2-2

    Fit-Up Gap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    105

    I-9.3-1

    Cross-Sectional View of a PP and PVDF Butt-Fusion Liner Bead Formed Against the Heater Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


    107

    III-3-1

    Solvent-Cement-Weld Shrink-Back Appearance (Cross-Sectional View) . . . . . . . . . . . . .

    117

    V-1.1-1

    Socket Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    124

    V-1.2-1

    Threaded Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    124

    V-2.3-1

    One-Piece Thermoplastic Flange With Reinforcing Rings . . . . . . . . . . . . . . . . . . . . . . .

    124

    A-2.3-1

    Contact Area Between Flange Adapter and Backup Ring . . . . . . . . . . . . . . . . . . . . . . .

    131

    A-2.3-2

    Plate Flange Adapter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    131

    A-2.3-3

    Convoluted Backup Ring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    131

    A-4.3.1-1

    Thermoplastic Flange Adapter — Typical for PE, PP, and PVDF Butt-Fused Lap-Joint Flange Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


    138

    A-4.3.2-1

    Typical ISO or DVS Metric Spigot Socket-Fusion Flange Adapters . . . . . . . . . . . . . . . . .

    139

    A-4.3.2-2

    Typical ISO or DVS Metric Flange Adapters for Socket Fusing . . . . . . . . . . . . . . . . . . .

    140

    A-4.3.2-3

    Special ISO or DVS Metric Butt-Fusion Flange Adapter for Higher-Pressure Connections

    141

    A-5.2-1

    Transistor Flange Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    144

    A-5.2-2

    Solid PVDF Flange and Backup Ring to Thermoplastic-Lined Metal Pipe . . . . . . . . . . . .

    145

    A-5.3-1

    One-Piece Flange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    145

    A-5.3-2

    Flange Adapter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    145

    A-9.4-1

    Drawings for Bolts With Nuts and Stud Bolts With Nuts . . . . . . . . . . . . . . . . . . . . . . .

    148


    Tables

    1-4-1

    Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8

    1-5-1

    Status of Appendices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9

    2-3.2.2-1

    Geometric Shape Rating (GSR) for HDPE Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    15

    2-3.2.2-2

    Design Factor (DF) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .