Published: 07/01/2007 ISBN(s): 0791830470 Number of Pages: 311
In stock
Warning: Last items in stock!
Availability date: 01/04/2022
AN INTERNA TIONAL C ODE
2007 ASME Boiler & Pressure Vessel Code
2008a Addenda July 1, 2008
I
RULES FOR CONSTRUCTION OF POWER BOILERS
ASME Boiler and Pressure Vessel Committee
Subcommittee on Power Boilers
Date of Issuance: July 1, 2008
This international code or standard was developed under procedures accredited as meeting the criteria for American National Standards and it is an American National Standard. The Standards Committee that approved the code or standard was balanced to assure that individuals from competent and concerned interests have had an opportunity to participate. The proposed code or standard was made available for public review and comment that provides an opportunity for additional public input from industry, academia, regulatory agencies, and the public-at-large.
ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.
ASME does not take any position with respect to the validity of any patent rights asserted in connection with any items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard are expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such rights, is entirely their own responsibility.
Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as government or industry endorsement of this code or standard.
ASME accepts responsibility for only those interpretations of this document issued in accordance with the established ASME procedures and policies, which precludes the issuance of interpretations by individuals.
The footnotes in this document are part of this American National Standard.
No part of this document may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior written permission of the publisher.
Library of Congress Catalog Card Number: 56-3934 Printed in the United States of America
The American Society of Mechanical Engineers Three Park Avenue, New York, NY 10016-5990
Copyright © 2008 by
THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS
All rights reserved
I Rules for Construction of Power Boilers II Materials
Part A — Ferrous Material Specifications Part B — Nonferrous Material Specifications
Part C — Specifications for Welding Rods, Electrodes, and Filler Metals Part D — Properties (Customary)
Part D — Properties (Metric)
Rules for Construction of Nuclear Facility Components
Subsection NCA — General Requirements for Division 1 and Division 2 Division 1
Subsection NB — Class 1 Components Subsection NC — Class 2 Components Subsection ND — Class 3 Components Subsection NE — Class MC Components Subsection NF — Supports
Subsection NG — Core Support Structures
Subsection NH — Class 1 Components in Elevated Temperature Service Appendices
Division 2 — Code for Concrete Containments
Division 3 — Containments for Transportation and Storage of Spent Nuclear Fuel and High Level Radioactive Material and Waste
Rules for Construction of Heating Boilers V Nondestructive Examination
VI Recommended Rules for the Care and Operation of Heating Boilers VII Recommended Guidelines for the Care of Power Boilers
VIII Rules for Construction of Pressure Vessels Division 1
Division 2 — Alternative Rules
Division 3 — Alternative Rules for Construction of High Pressure Vessels IX Welding and Brazing Qualifications
Fiber-Reinforced Plastic Pressure Vessels
Rules for Inservice Inspection of Nuclear Power Plant Components XII Rules for Construction and Continued Service of Transport Tanks
iii
Colored-sheet Addenda, which include additions and revisions to individual Sections of the Code, are published annually and will be sent automatically to purchasers of the applicable Sections up to the publication of the 2010 Code. The 2007 Code is available only in the loose-leaf format; accordingly, the Addenda will be issued in the loose-leaf, replacement-page format.
ASME issues written replies to inquiries concerning interpretation of technical aspects of the Code. The Inter- pretations for each individual Section will be published separately and will be included as part of the update service to that Section. Interpretations of Section III, Divisions 1 and 2, will be included with the update service to Subsec- tion NCA.
Interpretations of the Code are distributed annually in July with the issuance of the edition and subse- quent addenda. Interpretations posted in January at www.cstools.asme.org/interpretations are included in the July distribution.
The Boiler and Pressure Vessel Committee meets regu- larly to consider proposed additions and revisions to the Code and to formulate Cases to clarify the intent of existing requirements or provide, when the need is urgent, rules for materials or constructions not covered by existing Code rules. Those Cases that have been adopted will appear in the appropriate 2007 Code Cases book: “Boilers and Pressure Vessels” and “Nuclear Components.” Supple- ments will be sent automatically to the purchasers of the Code Cases books up to the publication of the 2010 Code.
iv
SUMMARY OF CHANGES
Addenda to the 2007 Edition of the Code are issued in the form of replacement pages. Revisions, additions, or deletions are incorporated directly into the affected pages. It is advisable, however, that all replaced pages be retained for reference.
Replace or insert the pages listed. Changes given below are identified on the pages by a margin note, A08, placed next to the affected area. Revisions to the 2007 Edition are indicated by 07. For the listing below, the Page references the affected area. A margin note, A08, placed next to the heading indicates Location. Revisions are listed under Change.
The Record Numbers listed below are explained in more detail in “List of Changes in Record Number Order” following the Summary of Changes.
Page xix–xxix xxxi | Location Roster Preamble | Change (Record Number) Updated to reflect 2008 Addenda (1) First sentence revised (07-1776) |
(2) Footnote 5 added (07-1776) | ||
1 | PG-2.4 | Added (07-334) |
2 | PG-5.6 | Added (06-1082) |
5 | PG-9.2 | Entries added (03-425, 01-416) |
6 | PG-9.4 | Revised (04-1627) |
10 | PG-19 | Footnote 8 revised (07-1744) |
11 | Table PG-19 | Last row added (03-425) |
13–19.3 | PG-26 | Added (07-1670) |
Table PG-26 | Added (07-1670) | |
PG-27.2 | PG-27.2.1, PG-27.2.1.1, PG-27.2.1.2, PG-27.2.1.5, and PG-27.2.2 revised (04-1670) | |
PG-27.3 | Nomenclature revised (04-1627) | |
PG-27.4 | (1) Note (1) revised (07-1670) (2) Note (3) revised (07-50) (3) Note (6) revised (03-425, 01-416) (4) Note (11) added (04-1627) | |
PG-29.1 | Variable w added to equation and nomenclature |
(07-1670)
PG-29.11 Variable w added to equation and nomenclature
(07-1670)
22 | PG-31.2 PG-32.1.2 | Definitions of tf and th revised (02-2580) In the nomenclature, definition of t revised (02-2580) |
37 | Fig. PG-52.1 | In General Note (a), “Fig. PG-53.1” corrected to “Fig. |
PG-52.1” by errata (07-714) | ||
45, 46 | PG-60.1 | Revised (06-127) |
PG-60.1.6 | Second paragraph revised (07-1816) | |
47 | PG-60.3.7(e) | Added (07-1816) |
Page | Location Fig. PG-60.3.7 | Change (Record Number) Added (07-1816) |
Fig. PG-60.3.9 | Title revised (07-1816) | |
PG-60.3.9 | Figure reference revised (07-1816) | |
48 | Safety Valves and Safety Relief Valves | Footnote 20 corrected by errata (07-306) |
49 | PG-67.2.4 | Metric value corrected by errata (08-115) |
PG-67.2.6 | Metric value corrected by errata (08-115) | |
PG-67.3 | Last sentence added (07-518) | |
52, 52.1 | PG-68.3 |
|
92 | Table PW-39 |
|
errata (07-1302)
Table PW-39 (1) Third column revised (06-1589)
General Note (a)(6) corrected by errata (07-1532)
General Note (a)(8)(c)(3) redesignated to (a)(9) by errata (07-1302)
Table PW-39 (1) Third and fourth columns revised (06-1589)
General Note (a)(6)(e) redesignated to (a)(7) by errata
(07-1302)
General Note (a)(8) added (07-466)
Table PW-39 (1) Third and fourth columns revised (06-1589)
General Note (d) added (07-466)
Table PW-39 (1) Fourth column revised (06-1589)
General Note (b) added (07-466)
Last sentence added to Note (4)(d) (07-1267)
Table PW-39 Third and fourth columns revised (06-1589)
Table PW-39 (1) Third and fourth columns revised
First parenthetical temperature revised in General Note (a) (06-1589)
Table PW-39 (1) Third, fourth, and fifth columns revised
First parenthetical temperature revised in General Note (06-1589)
105.1–105.3 | PW-44 | Added (04-1627) |
153 | PHRSG-4(b) | Last sentence added (07-1775) |
Table PHRSG-4 | Added (07-1775) | |
181 | A-125 | Nomenclature revised (07-1670) |
191 | A-317.2.1 | Last entry added to nomenclature (07-1670) |
192, 192.1 | A-317.3 | Nomenclature revised (07-1670) |
Page Location Change (Record Number)
Table A-360 (1) The first two publications under ASNT Specification
revised (06-12)
(2) Note (1) deleted, and subsequent notes renumbered
(07-105)
Form A-370 Number 2 added under “E” Code Symbol Stamp
(07-1300)
Volume 58 of the Interpretations to Section I of the ASME Boiler and Pressure Vessel Code follows the last page of this Addenda.
(e)
LIST OF CHANGES IN RECORD NUMBER ORDER
Record Number Change
01-416 Revised PG-9.2, PG-27.4, and Note (6) to incorporate UNS N06625 material for steam service. 02-2580 Revised definition of “tf” and “th” in PG-32.1.2 and definition of “t” in PG-32.1.2.
03-425 Revised PG-9.2; PG-27.4, Note (6); and Table PG-19 to incorporate Code Case 2226-2.
04-1627 Revised PG-9-4, PG-27.2.1, PG-27.2.1.1, PG-27.2.1.2, PG-27.2.1.5, and PG-27.3, and added Note (11) to
PG-27.4 and PW-44 to permit inclusion of clad thickness in the calculated strength of boiler tubes.
06-12 Revised Table A-360 to indicate adoption of SNT-TC-1A-2006 and CP-189-2006.
06-127 (a) Revised the text of PG-60.1 to preclude designs incorporating cross-webbed construction and better describe the requirements for gage glass designs incorporating multiple sections, as well as the conditions that will allow ommitting overlapping of the adjacent sections.
(b) Inserted new footnote for PG-60.1, and renumbered the existing footnotes.
06-567 (a) Revised PG-68.1 to clarify that the location rules of PG-68.3 and mounting rules of PG-71 apply to safety relief valves for separately fired superheaters.
(b) Issued intent interpretation.
06-1082 Added new paragraph PG-5.6 to provide guidance on the necessary actions, if during any phase of construc- tion or erection, a component is heated to a temperature greater than 1,470°F (800°C).
06-1589 (a) Cooling rate “60°C/hr” in Table PW-39, Note (1) for P-No. 7 and 10I revised to “55°C/hr.”
(b) Minimum holding time “2 min/mm” in Table PW-39 for P-Nos. 1, 3, 4, 5A, 5B (Group Nos. 1 and 2) , 6, 7, and 10I revised to “1 hr/25 mm.”
07-50 Deleted PG-27.4, Note (3)(d), and revised the “Value of C” table in PG-27.4, Note (3) so that it pertains to threaded sections or pipe.
07-105 Deleted Note (1) in Table A-360.
07-306 Editorially corrected PG-67, Note (19).
07-334 Added PG-2.4 to clarify service limitations as applied to thermal fluid heaters.
07-466 Incorporated Code Case 2578 by revising Tables PW-39, P-No. 4, P-No. 5A, and P-No. 5B materials to include the exemption of PWHT for attaching bare thermocouple wire by CDW and ERW.
07-518 Revised PG-67.3 to clarify the set pressure of Economizer Safety Relief Devices. 07-714 Fig. PG-52.1 corrected by errata.
07-1267 Added Note (4)(d) of Table PW-39 for P-No. 5B, Group No. 2 materials to direct the user to document the use of Note (4)(d) on the Manufacturer’s Data Report.
07-1300 Revised A-370 Guide to Information Appearing on Certificate of Authorization for “E” code symbol stamp to cover design and assembly of electric boilers at the location shown on the certificate of authorization and field sites controlled by the location.
07-1302 Revised Table PW-39 for P-No.1, P-No.3, and P-No.4 to correctly format the listed conditions for exemp- tion from PWHT requirements for stud welding of nonload-carrying studs.
07-1532 Table PW-39 corrected by errata.
07-1670 Added para. PG-26 and Table PG-26 to impose weld joint strength reduction factors on certain welds, pri- marily longitudinal and spiral, designed for service in the creep regime. New factor “w” was incorporated into equations in PG-27 (cylindrical components), PG-29 (heads), A-125 (thick-wall cylinder formula), and A-317 (alternative equation for cylinders under internal pressure).
07-1744 Corrected Footnote 8 reference to Appendix A-370. 07-1775 Revised PHRSG-4(b), and added Table PHRSG-4. 07-1776 Added HRSG to the list of devices in the Preamble.
07-1816 (a) In PG-60.1.6, added reference to PG-60.3.7(a) through (e) where examples on acceptable “flow through” valve construction are listed.
In PG-60.3.7, added (e) defining the acceptable “Y Pattern” globe valve construction, including printing the figure used in B31.1 as new Fig. PG-60.3.7.
Redesignated Fig. PG-60 as Fig. PG-60.3.9, and corrected the reference to that figure in PG-60.3.9. 08-115 Paras. PG-32, PG-67, and PG-68 corrected by errata.
(f)
Foreword ............................................................................... xv
Statements of Policy xvii
Personnel .............................................................................. xix
Preamble xxxi
Summary of Changes xxxiii
List of Changes in BC Order xxxvi
PART PG | GENERAL REQUIREMENTS FOR ALL METHODS OF CONSTRUCTION ..................................................... | 1 |
General | ||
PG-1 | Scope .................................................................... | 1 |
PG-2 | Service Limitations ........................................................ | 1 |
PG-3 | Referenced Standards ...................................................... | 1 |
PG-4 | Units..................................................................... |